From the dispenser to a public linear transponder
The spacecraft tumbles freely and needs no pointing. Operations come down to managing energy: the beacon runs all the time, and the transponder is scheduled for when and where operators want it.
Mission phases
- 0 · Integration & test Pre-launchFlatSat with the LTM on the bench, powered from the USB umbilical (which forces LTM_VSYS on). AMSAT's LTM acceptance test procedure is run, followed by flight-software qualification of the ltm1 CAN driver and environmental tests (random vibration, thermal vacuum and thermal cycling). The spacecraft is delivered with its RBF pin and with the deployment switches holding it powered off.
- 1 · Launch L-0Integrated in a 1U slot of a rideshare dispenser on SpaceX Transporter-22. Deployment switches and inhibits keep the battery disconnected, so there is no RF and no power during ascent.
- 2 · Deployment & quiet period T+0 → T+30 minThe deployment switches close and the RP2350 boots. It logs the boot count, starts the RTC and keeps the LTM rail OFF (R125 pull-down). No deployables fire and no RF is transmitted for 30 minutes. Magnetic B-dot detumble starts using the face coils.
- 3 · Antenna deployment T+30 minThe burn wire is fired through the TPS4H160 DEPLOY channel (about 1–2 A for a few seconds). The deployment flag is set in non-volatile memory. If the first burn fails, the software retries on later orbits with a sunlit-battery check.
- 4 · LTM power-on & first beacon T+45 minFlight software enables LTM_VSYS through MCP23017 GPB6, which is allowed only once antennas are deployed. The LTM boots in safe mode and starts its 1200 bps BPSK telemetry beacon. The FC begins sending health data (temperatures, UTC) over CAN.
- 5 · Commissioning Week 1 – 4The AMSAT command station checks LTM and bus health. FoxTelem stations worldwide upload frames to the AMSAT telemetry server. Team members verify the power and thermal trends against this site's budgets, then run short scheduled transponder tests.
- 6 · Nominal operations Month 1 → EOLThe beacon runs continuously. The transponder is power-limited to about 5–8 % duty (about 69 min/day at β = 0°). It is scheduled over high-demand regions (North America, Europe, Japan) and weekend events, with a battery-gated fallback (ON above 80 % state of charge, OFF below 70 %).
- 7 · Safe mode Any timeTriggered by low state of charge, a watchdog reset, an over- or under-temperature condition or a ground command. The LTM drops to safe mode (40 mA), the FC slows its clock, and the battery heater is thermostatic. Recovery is by ground command once the battery has charged.
- 8 · End of mission & disposal ~7 yr at 525 kmOn ground command the LTM transmitter is permanently disabled (FCC requires the ability to cease emissions). The spacecraft decays passively, and DAS shows every component demises on reentry.
Operating modes
Mode transitions are owned by the FC flight software. The LTM's own mode is requested over CAN, and AMSAT ground commands to the LTM can override it. See the power budget for line-item loads.
Ground segment
AMSAT command station(s)
High-gain stations uplink commands to the LTM command receiver (20 kHz FSK). This link has more than 30 dB margin at 10° elevation.
FoxTelem network
Volunteer stations decode the 1200 bps BPSK beacon with FoxTelem and forward frames to AMSAT's server, so coverage is global rather than limited to a single team ground station.
Amateur users
Users work SSB and CW through the 30 kHz V/u passband. Uplink Doppler is ±3.4 kHz and downlink ±10.2 kHz, so full-duplex Doppler tracking (for example with SatPC32 or Gpredict) is recommended.
Mission team
Reviews telemetry trends, plans transponder schedules and coordinates with AMSAT operations.